Recently, Dana has placed a "House-To-Do List so that we can have a party" sheet on the fridge so that I, who is very motivated with being able to mark stuff off a list, can keep plowing forward to get the house in decent shape.
Here is the list of things that we have done since the last post:
- installed kitchen cabinets
- installed kitchen appliances
- installed granite tile counter top
- installed kitchen and dinning room lights fixtures
- installed master bedroom drawers for my closet
- installed the clothes hanging bar for Dana's closet.
- installed shower tile and shower fixtures
- installed bathroom floor tile
- installed bathroom toliet and vanity
- installed bathroom vanity light and exhaust fan
- installed fans in the living room and both bedrooms
- installed all remaining electrical fixtures and plumbing fixtures
- installed front and back porch light fixtures
- finished the back deck and steps
- had a buddy of mine reglaze the tub, which he did a fantastic job
- finish cleaning the construction debris out from the side and back of the house
- install trim, including baseboard, crown and casing
- install the kitchen cabinets' kick plates
- install a french drain in front and sides of the house to take care of the flooding in our basement
- completely remove existing roof and install new roof sheating and shingles
- install trim around the windows and exterior of the house
- fix a few plumbing leaks
- install a cover for plumbing access panel
- MOW MY DANG GRASS!
Keep a look out for the evite coming in the next month or so for the party at Enzor Parnell House.